The Integrated Pumping Station Of The Buried Integrated Sewage Treatment Equipment
The Integrated Pumping Station Of The Buried Integrated Sewage Treatment Equipment
Product model:
Product date: 2020-12-03
Brief description: The integrated pumping station of the buried integrated sewage treatment equipment located on the roadway should be equipped with a concrete well base with sufficient bearing capacity and stability, the well cover should be flat with the road surface, and the integrated prefabricated pumping station of the buried integrated sewage treatment equipment with a single shaft diameter greater than 3M or a combination of multiple shafts should be specially designed for the foundation.
What regulations should buried integrated sewage treatment equipment comply with?
The integrated prefabricated pumping station with a single shaft diameter greater than 3M or with multiple shafts combined should be specially designed for the foundation.
Buried integrated sewage treatment equipment other specifications of integrated pumping stations should be reviewed for foundation.
Buried integrated sewage treatment equipment should be set in the green belt.
For an integrated pumping station located in the green belt, the roof shall meet the following requirements:
1. The top cover of the wet pumping station should be more than 200mm higher than the surrounding ground.
2. dry pump station cover should be higher than 450mm above the surrounding ground, and should be waterproof design.
The integrated pumping station located on the carriageway should be equipped with concrete well base with sufficient bearing capacity and stability, and the well cover should be flat with the road surface.
The integrated pumping station located in the non-motorized lane, square and other areas should be equipped with a roof with sufficient bearing capacity and stability, and the roof should be flat with the road surface